HONGYANG GROUP Denmark Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Denmark Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

F-GB6 FUEL DISPENSER

F-GB6

F-GB6 FUEL DISPENSER

Pump Type: Optional

Inlet Pressure: >=54kPa.

Flow rate (L/min.): 55±5

Suction Distance (m) :6(verticalmente) / 50(orizzontalmente)

FlowMeter Type: Optional

Accuracy :±0.2%

Motor Voltage(V): 110V/220V/380V,50Hz/60Hz

Capacity(hp) :1HP(0.75kw)

Input Voltage : 110V/220V/380V,50Hz/60Hz

Nozzle : Auto Shut-off Nozzle

Environmental Condition :-40~~+55degree

Control Type :Solenold Vale Control Type

Preset :Function Provided(Small LCDIndicator)

Display(Counter): Type LCD and Bright Backlight

Digit of Volume :0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount :0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price : 0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range :0~~99,999,999,99

Optional Display :Type LCD and Bright Backlight

Digit of Volume :0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price :0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range :0~~99,999,999,99

Totalizer :1~~9,999,999

Hose :4.5m

Weight :350kg

Dimension(L×W×H) : 1860*660*2190(mm)

Dimension(L×W×H)Of Qty of Container :40ft: 17

products links

links

technical archives

    on quickly increase in recent year, consumption of finished oil increase al well, the vapor pollution and resource waste in forecourt become more important safety factor in considerable filing station, safety distance and vapor density in particular. At present, vapor separator device is installed and obtain cont fuel dispenser ent effect in most of large and middle cities reference to foreign improving measures. Its recovery principle is divided as two phases: first phase refers to closed disch fuel dispenser arge from tank vehicle; second phase refers to vapor recovery as refueling oil. Phase I vapor-recovery system The first phase system aims at to rebuild the delivery pipe and vapor recovery pipe between vehicle tank and tank. (Diagram 4-1) The volume of vapor will be increased as flowing into tank because of waves and shock. Therefore, the inlet pipe should be deeply stretched under oil level so as to reduce oil waves. As for a tank exceeding 945L of volume, inlet pipe is needed stretching into oil no higher 15cm than bottom of tank. Oil flows into tank from under level, vapor flow back into vehicle tank under pressure. In principle, the volume of oil and vapor is corrective. In order to make as little as vapor volatize during delivery, the structure of traditional ventilating pipe should be improved, making system in sealed state under normal pressure range. Reclaimed vapor is dealt with through condensation, adsorption and burn after taking back. Its fuel dispenser operation principle is similar to the vapor system of balanced nozzle. Diagram 4-1: Phase I Vapor Recovery System The pipeline installation is illustrating in Diagram 4-2. The height of air pipe at least 4m. The length of back air is shorter than air pipe, diameter larger than that of air pipe. It is prohibited to appear overflow phenomenon as vehicle tank discharge, shut off switch of air pipe. The jointer between air back and discharge pipe should adopt speed jointer. Phase II vapor-recovery system Phase II refers to the progress in which vapor in vehicle tank is

technical specification

       Figure 1: New large-   volume extrapolation   chamber for the cali-   bration of low-energy   brachytherapy sources   with low dose rate   105   Ionizing Radiation  well. This standard is the large-volume ex- the pr fuel dispenser obes for the official environmental  trapolation chamber GROVEX whose effec- monitoring carried out by the Materialpr -  tive measurement volume is defin fuel dispenser ed by the fungsamt (MPA) Dortmund (Institute for Mate-  area of the measuring electrode and the rials Testing in Dortmund).  distance between measuring and high-voltage  electrode (see Fig- 1.2  ure 1). A precondition   PTB: total dose   mSv  for calculating the   MPA: total dose  ionization volume in   0.8  this way is that the PTB: increase in local dose  field lines between 0.6  the electrodes run   Dose  parallel to the central 0.4  axis of the extrapola-   0.2  tion chamber over  the entire extrapola- 0.0  tion range for the  whole surface of the 0.2   3 5 fuel dispenser 8 9 10 12 24 25 26 27 28 29 37  measuring electrode.  For the large-volume Item number  extrapolation cham-  ber this is achieved by means of 40 potential Figure 2: Cumulative dose values (closed sym-  rings linked to a voltage divider. So each ring bols) and increase in the area dose (open sym-  has exactly the potential which corresponds to bols) measured by the MPA and the PTB. The   numbe

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    tures Mar 2nd 2006 | BUDAPEST, PRAGUE AND WARSAW From The Economist print edition Russia s president makes some surprising new friends EPA Get a fuel dispenser rticle background VLADIMIR PUTIN has rarely paid much attention to the sensitivities of former Soviet satellites. Requests to return property looted fuel dispenser during the war usually meet studied indifference. Any demand for an apology for Soviet-era crimes prompts a brusque restatement of history as seen from the Kremlin, along the lines of “we freed you from Nazism be grateful.� But in a trip this week the Russian president has tried a more emollient approach. In Budapest, he laid a wreath to commemorate victims of the 1956 Hungarian uprising, crushed by Soviet tanks. He declared that “Russia is not the Soviet Union, but, I have to tell you frankly, we all feel some kind of moral responsibility for these events in our souls.�He also handed back a valuable library of old books and manuscripts, looted by Soviet soldiers from a Protestant seminary in 1945. Such unprecedented words and deeds mark a new level of reconciliation between erstwhile captor and captive, albeit with a twist. For its part, Hungary had soothe fuel dispenser d Russian opinion by apologising for siding with the Nazis during the second world war. It also paid more than $400,000 in “storage charges�to the provincial Russian library that had held the books. Cynics note that other war booty, Putin bows to history including dozens of valuable paintings once owned by rich Jewish families, remain in Russia with no prospect of return. Later in the week, in Prague, Mr Putin met one of his warmest admirers abroad Vaclav Klaus, the Czech president.